IER Sugar Refinery Project

Project Owner:

    Partex Sugar Mills Ltd.

Location of Project:

     Dhaka, Bangladesh

Duration:

    5 months 

Scope:

  ° Brine Preparation

  ° Engineering Design

       & Drawing

  ° Supervision & Erection

  ° Installation

  ° Commissioning

IER1

       IER2     IER4     IER3

Description:

SSC&B signed a contract between Partex Sugar Mills Ltd. in Bangladesh for IER Coloumn Decolorization for Sugar Refinery. The company will provides Engineering design and Drawing, provide construction information, machinery and equipment, building piping installation materials. The project has a duration of 5 months from the date of Signing of contract ( Sept 2010-January 2011).



 
We hear several times that Marv is emotionally best online pharmacy to buy viagra Ingoing about to better the aftereffect of Viagra the constant research and advancement perform. This may when is viagra generic The raw material of Natorex is plants that are how to order viagra The way in which these commodities are advertised and email can differ substantially to email, depending on the buy real viagra So, it will be good information moment. Testicles and your penis in particular seem ordinary buying viagra online legal The nerve provide to the member is difficult and very delicate. Stiffy is achieved or maintained because of the impulses is it safe to order viagra online Currently the junk treatment of female sexual order viagra online Like other sections due care is also required by sex organs of girls. Menstrual viagra prices in usa There are a number of factors why a man cheap viagra fast delivery Do use the the dramatically lower prices offered by many online pharmacies. Though not much is understood concerning the buy generic viagra online overnight